![Morrisons Electrical Mega store â Stage 2 Morrisons Electrical Mega store â Stage 2](http://sancoprojects.com.au/wp-content/uploads/Morrisons-Stage-2-060-300x200.jpg)
2nd February 2012
Project Description
A New Store room light weight metal clad wall separating the existing store room area was constructed along with a new disabled toilet block, all services were modified and separated to allow strata title, upgrade fire services and new Fire Hose Reels were installed. A large section of the rear wall tilt up concrete panel was cut and removed , a large commercial grade roller door was install and a new concrete driveway area created to satify the new dual access requirements. The project was completed in approximately a 4 week construction period. Access to the area was available to the client at all time with multiple staging of the works to accomidate un hindered access for staff requiring access to the construction area and loading dock. OHS&E was managed at the highest level with the project reporting a perfect safety record with 0 injuries, 0 incidients.
Client Drivers / Brief
Continuing uninterrupted operation of existing store room and loading dock, OH&S management and safety of staff, security to be maintained during construction.
Comments
A very successful project, thank you to all involved.
Thanks to...
- Design Studio 22 - Tony Ross
- Howard , Garth and Brett Morrrison and their staff
- Staff of outdoor furniture specialists
- North Coast Cranes
- Tony Nolan Building
- Phil Hopkins Plastering
- Coffs Harbour Plumbing
- Coffs Coast Tiling
- Stocks and Hogan
- Doug Knight Electrical